CallCheck your roof

Cherry Hills Village

A Tudor on the north side of the village. Eight working days in June 2024. The south planes stayed.

Check your roof

Own crews · 25-year workmanship warranty · we meet your adjuster on the roof

A steep plane of thick gray slate, wet in the sun, with pines along the ridge.
North plane, the afternoon we finished the courses. June 2024.

Hail at 1.75 inches on 12 June took the north planes. We replaced them in slate, kept the copper that still held, and met the adjuster on the roof before a slate was ordered.

The 12 June storm put down 1.75 inches of hail. It cracked the north courses and split the copper in the west valley. The first company walked the south side from the driveway and wrote the north off. The roof was 27 years old, set in 1997, and the HOA wanted the color of those courses, not a new black roof.

We met the adjuster on the north plane on 18 June. The claim paid that plane and the valley. Unfading gray-green slate, 3/8 inch, went back in the same coursing. Copper that still held was kept. The cracked length was new 20-ounce. Ice-and-water runs 36 inches up the north eave and through both valleys. The boxwoods never moved.

The job

Cherry Hills Village, 2024
HouseTudor, 7,200 sq ft, built 1996
Roof62 squares. Main pitches 14:12 and 12:12
YearJune 2024, after the 12 June hail
Budget$240,000–$310,000, claim on the north
On site8 working days, own crew
SlateUnfading gray-green, 3/8 in, 75–100 years on these pitches
Copper20-ounce valleys. Sound 1997 copper kept
Warranty25 years workmanship. Slate maker to 50, registered before we left

Days on site

  1. Day 1Tear-off on the north and both valleys. A magnet through the beds before lunch. The south planes stayed covered and untouched.
  2. Day 2Two soft spots in the north deck cut out and replaced. Ice-and-water 36 inches up the eave and the full length of both valleys.
  3. Day 3Copper. The west valley was split for eleven feet. That length is new 20-ounce. The east valley was sound and stayed.
  4. Days 4–7Slate courses, north first, then the dormer. Colour checked against the south courses we did not remove.
  5. Day 8Ridge, hips, and a walk with Margaret. Photo set for the claim file. Warranty card in her kitchen before we rolled the magnets a last time.

What the homeowner said

They met the adjuster on the slate, and the claim covered the north planes the first company had skipped. Eight days later the copper was in and the boxwoods were where we left them.
Margaret, Cherry Hills Village